PUBLIC NOTICE IN THE PROCEDURE FOR ISSUANCE OF LICENSE FOR CONSTRUCTION OF POWER GENERATION FACILITY - SE-SOLAR ENERGY 143 Print

Pursuant to Article 4.7 of the Law on Transmission of Electric Power, Regulator and System Operator of Bosnia and Herzegovina (Official Gazette of BIH, 7/02, 13/03, 76/09 and 1/11), and Article 10 of the Licensing Rule – Consolidated Version (Official Gazette of BIH, 63/16), the State Electricity Regulatory Commission issues a 

PUBLIC NOTICE

IN THE PROCEDURE FOR ISSUANCE OF LICENSE FOR CONSTRUCTION OF POWER GENERATION FACILITY  

 

Legal person  “SE-Solar Energyˮ d.o.o., Zavidovići, intends to start the construction of a power generation facility with the capacity exceeding 1 MW in the territory of Brčko District of BIH, that is, a photovoltaic plant in the location of “Ivakićke”, which is the reason why it filed with the State Electricity Regulatory Commission (SERC) the application for issuance of a license for the construction of a power generation facility.

The Company was founded in accordance with the Articles of Association (OPU-IP: 529/2023 of 1 June 2023) and it was registered with the Zenica Municipal Court. The founder of the subject of registration is Avdušinović Fata. 

The license applicant is obligated to provide evidence of fulfilling all criteria and standards for the issuance of the license. The application has to verify technical, legal and financial capacities of the applicant to fulfil all the criteria, conditions and standards as prescribed by the Law on Transmission of Electric Power, Regulator and System Operator of Bosnia and Herzegovina and the Licensing Rule.

These criteria are conducive to the creation of conditions for unlimited and free trade and continued electricity supply in accordance with the defined quality standard to the benefit of BIH citizens, and the creation of the electricity market. SERC is free to include in the licence conditions requirements reflecting the relevant acquis of the European Union and contributing to the objectives of laws of Bosnia and Herzegovina as well as rules and regulations of the State Electricity Regulatory Commission.

The persons interested in acquiring intervener status may file a written request with the State Electricity Regulatory Commission no later than 29 July 2025. The intervener status may be granted to a person who proves a direct interest in the procedure for issuance of the licence, which differs from the general public interest for issuance of the licence. The role and responsibilities of interveners in the procedure for issuance of licences are defined in Article 11 of the Licensing Rule.

By the same date the public may have access to individual documents of the application for information purposes at the SERC premises or submit written comments on the licence application at the address of the State Electricity Regulatory Commission (Tuzla, Đorđa Mihajlovića 4/II, fax 035/302-077, email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it ).

 
DERK © 2004-2025. All Rights Reserved.